Rather than focus on CCA procurement, the CPUC would better serve the state to use the provisions of AB 57 (e.g., PUC Section 454.5(b)(6)) and its other authorities, including those still in force from AB 1890 (1996). PG&E and SCE already collected $7 billion on an accelerated basis during the “competitive transition period” from 1998 to 2001 towards their legacy utility-owned generation resources such as Diablo Canyon, San Onofre and their hydropower generation. SDG&E completely paid off its generation portfolio in 1999 this way. Further, PG&E had already recovered its entire investment in Diablo Canyon by December 31, 1997 prior to the start of the opening of the restructured market. (I tracked the CTC accounts throughout the period, reporting to the CEC in 2001, and calculated the return on investment in Diablo Canyon for settlement discussions in 1996.) If the Commission wanted to repay the debts incurred during the 2000-01 energy crisis, the better solution, which it did in part with SCE, would have been to simply establish a “regulatory asset” with no connection to the generating facilities which had already been paid off. As it is, customers-–bundled and departed–are paying twice (and THREE times in the case of Diablo Canyon) for the same power plants.
The IOUs currently lack any real incentives to control their portfolio costs, as evidenced by their bundled portfolio plans for PG&E and SCE. Those plans say nothing about minimizing costs or managing risks except to avoid incurring shareholder penalties for missing the RPS mandates. In fact, PG&E has accrued a 3.3 cents per kilowatt-hour premium above the market value of its RPS portfolio to protect against a potential “price spike” between now and 2027. It is no wonder that customers have become unhappy with how the IOUs have managed their generation portfolios.
Pingback: The real lessons from California’s 2000-01 electricity crisis and what they mean for today’s markets | Economics Outside the Cube