In the LA Times – looking for alternative solutions to storm outages

I was interviewed by a Los Angeles Times reporter about the recent power outages in Northern California as result of the wave of storms. Our power went out for 48 hours New Year’s Eve and again for 12 hours the next weekend:

After three days without power during this latest storm series, Davis resident Richard McCann said he’s seriously considering implementing his own microgrid so he doesn’t have to rely on PG&E.

“I’ve been thinking about it,” he said. McCann, whose work focuses on power sector analysis, said his home lost power for about 48 hours beginning New Year’s Eve, then lost it again after Saturday for about 12 hours.

While the storms were severe across the state, McCann said Davis did not see unprecedented winds or flooding, adding to his concerns about the grid’s reliability.

He said he would like to see California’s utilities “distributing the system, so people can be more independent.”

“I think that’s probably a better solution rather than trying to build up stronger and stronger walls around a centralized grid,” McCann said.

Several others were quoted in the article offering microgrids as a solution to the ongoing challenge.

Widespread outages occurred in Woodland and Stockton despite winds not being exceptionally strong beyond recent experience. Given the widespread outages two years ago and the three “blue sky” multi hour outages we had in 2022 (and none during the September heat storm when 5,000 Davis customers lost power), I’m doubtful that PG&E is ready for what’s coming with climate change.

PG&E instead is proposing to invest up to $40 billion in the next eight years to protect service reliability for 4% of their customers via undergrounding wires in the foothills which will raise our rates up to 70% by 2030! There’s an alternative cost effective solution that would be 80% to 95% less sitting before the Public Utilities Commission but unlikely to be approved. There’s another opportunity to head off PG&E and send some of that money towards fixing our local grid coming up this summer under a new state law.

While winds have been strong, they have not been at the 99%+ range of experience that should lead to multiple catastrophic outcomes in short order. And having two major events within a week, plus the outage in December 2020 shows that these are not statistically unusual. We experienced similar fierce winds without such extended outages. Prior to 2020, Davis only experienced two extended outages in the previous two decades in 1998 and 2007. Clearly the lack of maintenance on an aging system has caught up with PG&E. PG&E should reimagine its rural undergrounding program to mitigate wildfire risk to use microgrids instead. That will free up most of the billons it plans to spend on less than 4% of its customer base to instead harden its urban grid.

A cheaper wildfire mitigation solution: using microgrids instead of undergrounding

PG&E released its 2022 Wildfire Mitigation Plan Update (2022 WMPU) That plan calls for $6 billion of capital investment to move 3,600 miles of underground by 2026. This is just over a third of the initial proposed target of 10,000 miles. Based on PG&E’s proposed ramping up, the utility would reach its target by 2030.

One alternative that could better control costs would be to install community and individual microgrids. Microgrids are likely more cost effective and faster means of reducing wildfire risk and saving lives. I wrote about how to evaluate this choice for relative cost effectiveness based on density of load and customers per mile of line.

Microgrids can mitigate wildfire risk by the utility turning off overhead wire service for extended periods, perhaps weeks at a time, during the highest fire risk periods. The advantage of a periodically-islanded microgrid is 1) that the highest fire risk coincides with the most solar generation so providing enough energy is not a problem and 2) the microgrids also can be used during winter storms to better support the local grid and to ride out shorter outages. Customers’ reliability may degrade because they would not have the grid support, but such systems generally have been quite reliable. In fact, reliability may increase because distribution grid outages are about 15 times more likely than system or regional outages.

The important question is whether microgrids can be built much more quickly than undergrounding lines and in particular whether PG&E has the capacity to manage such a buildout at a faster rate? PG&E has the Community Microgrid Enablement Program. The utility was recently authorized to build several isolated microgrids as an alternative to rebuilding fire-damaged distribution lines to isolated communities. Turning to local governments to manage many different construction projects likely would improve this schedule, like how Caltrans delegates road construction to counties and cities.

Controlling the costs of wildfire mitigation

Based on the current cost of capital this initial undergrounding phase will add $1.6 billion to annual revenue requirements or an additional 8% above today’s level. This would be on top of PG&E request in its 2023 General Rate Case for a 48% increase in distribution rates by 2023 and 78% increase by 2026, and a 31% increase in overall bundled rates by 2023 and 43% by 2026. The 2022 WMPU would take the increase to over 50% by 2026 (and that doesn’t’ include the higher maintenance costs). That means that residential rates would increase from 28.7 cents per kilowatt-hour today (already 21% higher than December 2020) to 36.4 cents in 2026. Building out the full 10,000 miles could lead to another 15% increase on top of all of this.

Turning to the comparison of undergrounding costs to microgrids, these two charts illustrate how to evaluate the opportunities for microgrids to lower these costs. PG&E states the initial cost per mile for undergrounding is $3.75 million, dropping to $2.5 million, or an average of $2.9 million. The first figure looks at community scale microgrids, using National Renewable Energy Laboratory (NREL) estimates. It shows how the cost effectiveness of installing microgrids changes with density of peak loads on a circuit on the vertical axis, cost per kilowatt for a microgrid on the horizontal axis, and each line showing the division where undergrounding is less expensive (above) or microgrids are less expensive (below) based on the cost of undergrounding. As a benchmark, the dotted line shows the average load density in the PG&E system, combined rural and urban. So in average conditions, community microgrids are cheaper regardless of the costs of microgrids or undergrounding.

The second figure looks at individual residential scale microgrids, again using NREL estimates. It shows how the cost effectiveness of installing microgrids changes with customer density on a circuit on the vertical axis, cost per kilowatt for a microgrid on the horizontal axis, and each line showing the division where undergrounding is less expensive (above) or microgrids are less expensive (below). As a benchmark, the dotted line shows the average customer density in the PG&E system, combined rural and urban. Again, residential microgrids are less expensive in most situations, especially as density falls below 75 customers per mile.

A movement towards energy self-sufficiency is growing in California due to a confluence of factors. PG&E’s WMPU should reflect these new choices in manner that can reduce rates for all customers.

(Here’s my testimony on this topic filed by the California Farm Bureau in PG&E’s 2023 General Rate Case on its Wildfire Management Plan Update.)

Comparing cost-effectiveness of undergrounding vs. microgrids to mitigate wildfire risk

Pacific Gas & Electric has proposed to underground 10,000 miles of distribution lines to reduce wildfire risk, at an estimated cost of $1.5 to $2 million per mile. Meanwhile PG&E has installed fast-trip circuit breakers in certain regions to mitigate fire risks from line shorts and breaks, but it has resulted in a vast increase in customer outages. CPUC President Batjer wrote in an October 25 letter to PG&E, “[s]ince PG&E initiated the Fast Trip setting practice on 11,500 miles of lines in High Fire Threat Districts in late July, it has caused over 500 unplanned power outages impacting over 560,000 customers.” She then ordered a series of compliance reports and steps. The question is whether undergrounding is the most cost-effective solution that can be implemented in a timely manner.

A viable alternative is microgrids, installed at either individual customers or community scale. The microgrids could be operated to island customers or communities during high risk periods or to provide backup when circuit breakers cut power. Customers could continue to be served outside of either those periods of risk or weather-caused outages.

Because microgrids would be installed solely for the purpose of displacing undergrounding, the relative costs should be compared without considering any other services such as energy delivered outside of periods of fire risk or outages or increased green power.

I previously analyzed this question, but this updated assessment uses new data and presents a threshold at which either undergrounding or microgrids is preferred depending on the range of relative costs.

We start with the estimates of undergrounding costs. Along with PG&E’s stated estimate, PG&E’s 2020 General Rate Case includes a settlement agreement with a cost of $4.8 million per mile. That leads to an estimate of $15 to $48 million. Adding in maintenance costs of about $400 million annually, this revenue requirement translates to a rate increase of 3.2 to 9.3 cents per kilowatt-hour.

For microgrid costs, the National Renewable Energy Laboratory published estimated ranges for both (1) commercial or community scale projects of 1 megawatt with 2.4 megawatt-hours of storage and (2) residential scale of 7 kilowatts with 20 kilowatt-hours of storage. For larger projects, NREL shows ranges of $2.07 to $2.13 million; we include an upper end estimate double of NREL’s top range. For residential; the range is $36,000 to $38,000.

Using this information, we can make comparisons based on the density of customers or energy use per mile of targeted distribution lines. In other words, we can determine if its more cost-effective to underground distribution lines or install microgrids based on how many customers or how much load is being served on a line.

As a benchmark, PG&E’s average system density per mile of distribution line is 50.6 customers and 166 kW (or 0.166 MW).

The table below shows the relative cost effectiveness for undergrounding compared to community/commercial microgrids. If the load density falls below the value shown, microgrids are more cost effective. Note that the average density across the PG&E service area is 0.166 MW which is below any of the thresholds. That indicates that such microgrids should be cost-effective in most rural areas.

The next table shows the relative cost effectiveness for individual residential microgrids, and again if the customer density falls below the threshold shown, then microgrids save more costs. The average density for service area is 51 customers per line-mile which reflects the concentration of population in the Bay Area. At the highest undergrounding costs, microgrids are almost universally favored. In rural areas where density falls below 30 customers per line-mile, microgrids are less costly at the lower undergrounding costs.

PG&E has installed two community-scale microgrids in remote locations so far, and reportedly considering 20 such projects. However, PG&E fell behind on those projects, prompting the CPUC to reopen its procurement process in its Emergency Reliability rulemaking. In addition, PG&E has relied heavily on natural gas generation for these.

PG&E simply may not have the capacity to construct either microgrids or install undergrounded lines in a timely manner solely through its organization. PG&E already is struggling to meet its targets for converting privately-owned mobilehome park utility systems to utility ownership. A likely better choice is to rely on local governments working in partnership with PG&E to identify the most vulnerable lines to construct and manage these microgrids. The residential microgrids would be operated remotely. The community microgrids could be run under several different models including either PG&E or municipal ownership.

Vegetation maintenance the new “CFL” for wildfire management

PG&E has been aggressively cutting down trees as part of its attempt to mitigate wildfire risk, but those efforts may be creating their own risks. Previously, PG&E has been accused of just focusing numeric targets over effective vegetation management. This situation is reminiscent of how the utilities pursued energy efficiency prior to 2013 with a seemingly single-minded focus on compact fluorescent lights (CFLs). And that focus did not end well, including leading to both environmental degradation and unearned incentives for utilities.

CFLs represented about 20% of the residential energy efficiency program spending in 2009. CFLs were easy for the utilities–they just delivered steeply discounted, or even free, CFLs to stores and they got to count each bulb as an “energy savings.” By 2013, the CPUC ordered the utilities to ramp down spending on CFLs as a new cost-effective technology emerged (LEDs) and the problem of disposing of mercury in the ballasts of CFLs became apparent. But more importantly, it turned out that CFLs were just sitting in closets, creating much fewer savings than estimated. (It didn’t help that CFLs turned out to have a much shorter life than initially estimated as well.) Even so, the utilities were able claim incentives from the California Public Utilities Commission. Ultimately, it became apparent that CFLs were largely a mistake in the state’s energy efficiency portfolio.

Vegetation management seems to be the same “easy number counting” solution that the utilities, particularly PG&E, have adopted. The adverse consequences will be significant and it won’t solve the problem in the long. Its one advantage is that it allows the utilities to maintain their status quo position at the center of the utility network.

Other alternatives include system hardening such as undergrounding or building microgrids in rural communities to allow utilities to deenergize the grid while maintaining local power. The latter option appears to be the most cost effective solution, but it is also the most threatening to the current position of the incumbent utility by giving customers more independence.

Microgrids could cost 10% of undergrounding PG&E’s wires

One proposed solution to reducing wildfire risk is for PG&E to put its grid underground. There are a number of problems with undergrounding including increased maintenance costs, seismic and flooding risks, and problems with excessive heat (including exploding underground vaults). But ignoring those issues, the costs could be exorbitant-greater than anyone has really considered. An alternative is shifting rural service to microgrids. A high-level estimate shows that using microgrids instead could cost less than 10% of undergrounding the lines in regions at risk. The CPUC is considering a policy shift to promote this type of solution and has new rulemaking on promoting microgrids.

We can put this in context by estimating costs from PG&E’s data provided in its 2020 General Rate Case, and comparing that to its total revenue requirements. That will give us an estimate of the rate increase needed to fund this effort.

PG&E has about 107,000 miles of distribution voltage wires and 18,500 in transmission lines. PG&E listed 25,000 miles of distribution lines being in wildfire risk zones. The the risk is proportionate for transmission this is another 4,300 miles. PG&E has estimated that it would cost $3 million per mile to underground (and ignoring the higher maintenance and replacement costs). And undergrounding transmission can cost as much as $80 million per mile. Using estimates provided to the CAISO and picking the midpoint cost adder of four to ten times for undergrounding, we can estimate $25 million per mile for transmission is reasonable. Based on these estimates it would cost $75 billion to underground distribution and $108 billion for transmission, for a total cost of $183 billion. Using PG&E’s current cost of capital, that translates into annual revenue requirement of $9.1 billion.

PG&E’s overall annual revenue requirement are currently about $14 billion and PG&E has asked for increases that could add another $3 billion. Adding $9.1 billion would add two-thirds (~67%) to PG&E’s overall rates that include both distribution and generation. It would double distribution rates.

This begs two questions:

  1. Is this worth doing to protect properties in the affected urban-wildlands interface (UWI)?
  2. Is there a less expensive option that can achieve the same objective?

On the first question, if we look the assessed property value in the 15 counties most likely to be at risk (which includes substantial amounts of land outside the UWI), the total assessed value is $462 billion. In other words, we would be spending 16% of the value of the property being protected. The annual revenue required would increase property taxed by over 250%, going from 0.77% to 2.0%.

Which turns us to the second question. If we assume that the load share is proportionate to the share of lines at risk, PG&E serves about 18,500 GWh in those areas. The equivalent cost per unit for undergrounding would be $480 per MWh.

The average cost for a microgrid in California based on a 2018 CEC study is $3.5 million per megawatt. That translates to $60 per MWh for a typical load factor. In other words a microgrid could cost one-eighth of undergrounding. The total equivalent cost compared to the undergrounding scenario would be $13 billion. This translates to an 8% increase in PG&E rates.

To what extent should we pursue undergrounding lines versus shifting to microgrid alternatives in the WUI areas? Should we encourage energy independence for these customers if they are on microgrids? How should we share these costs–should locals pay or should they be spread over the entire customer base? Who should own these microgrids: PG&E or CCAs or a local government?